    BOILER ENGINEER
    The boiler has advantages of large power capacity, high power generation efficiency and high consumption of fuel. Therefore, it is necessary to guarantee the safety of the boiler. The breakdown of the boiler will cause casualties and the equipment damage, which will bring huge losses to the enterprise. The common accidents of the boiler in operation include tube burst, boiler furnace deflagration, coking, air pre-heater deformation and casualties.
    Please Ask Questions From Engineers( You may ask questions in Bahasa Indonesia.)
    Hot Topic
    / 2017-12-19
    Boiler feed water pum0
    Why boiler feed water pump side outboard high temperature?
    It is common for the pump body to overheat the pump body because of the friction caused by the bearing damage, or because of the lack of oil and oil in the lubricating system. Therefore, after finding that the pump body is overheating, check whether the lubricating system is lacking in oil or lubricating oil containing impurities, and then check whether the bearing is damaged. It is necessary to check whether the rolling bearing or bracket cover is too small for the overheating of the newly overhauled pump body. Pump body after pass the inspection still fever should check whether the pump shaft is bent or two different axis center, at the same time to check the impeller balance, adjustment pump shaft or two shaft concentricity, remove the impeller balance hole, to ensure the pump shaft and the impeller rotation balance, troubleshooting.
    / 2017-11-17
    Electrical
    See the bottom pic!! My plant capacity is 15 MW and I have maintaining always negative reactive power.Is there any problem if I maintain negative reactive power always???
    Hello, sir. Negative reactive power can not allow to run in the longer time. Please adjust power factor, control it to around 80. If still have questions, please leave your name with email address and mobile number. I will contact you right away, and if needed, send our technician to help solve your problems.
    / 2016-10-05
    Describe the procedure of scraping the steel pad of bush?
    In the bush depression nest coat with a thin layer of red lead, under the three steel pad thereon grinding coloring the colored marks be repaired using a fine rasp or scraper blade, after three steel pad contacts simultaneously qualified, and then make the pad on the lower part steel pad thickness reduce 0.05 ~ 0.07mm, it can achieve scraping requirements. Note that identify colored marks, smear red lead oil too much is likely to cause the illusion.
    1234567...113
    Write Your Comments
    100% customer satisfaction is our service philosophy, and to further improve our service quality and understand client satisfaction toward our engineer, we have establish a comment system where our clients can make an evaluations for the engineers that serve them.
    Grade
    19-17-2017
    By
    Thanks for your sir, im really really impressed with Eugene's work. it has made the classrooms very interesting.?
    Grade
    16-16-2016
    By Doni
    Thanks for you sir i have got a very good technical information from your these moves cheer .?
    Reply:you are welcome?