      How to control differential expansion when turbine startup?

      The following measures can be taken according to the unit case:

      ⑴select the appropriate red switch parameters.

      ⑵develop appropriate temperature and pressure curves.

      ⑶promptly use cylinders, flanges heater for controlling the temperature difference of the metal components within a predetermined range.

      ⑷speed control increases the speed and fixed speed warm-up time, after-load, according to the master cylinder temperature rise load speed.

      ⑸timely adjustment vacuum when warming punch machines.

      ⑹Bearing seal steam supply using appropriate and timely adjustments.